Project Half Double: Preliminary Results for Phase 1, June 2016

Authors

Per Svejvig; Michael Ehlers; Karoline Thorp Adland; Sara Grex; Signe Hedeboe Frederiksen; Martin Malthe Borch; Nicolai Elborough Boston; David Barnekow Erichsen; Christian Gyldahl; Christoffer Bækgaard Ludwig; Sune Edmund Pedersen

Synopsis

Project Half Double has a clear mission to succeed in finding a project methodology that can increase the success rate of our projects while increasing the speed at which we generate new ideas and develop new products and services. Chaos and complexity should be seen as a basic condition and as an opportunity rather than a threat and a risk. We are convinced that by doing so, we can strengthen Denmark’s competitiveness and play an important role in the battle for jobs and future welfare. 

The overall goal is to deliver “projects in half the time with double the impact”, where projects in half the time should be understood as half the time to impact (benefit realisation, effect is achieved) and not as half the time for project execution.

The purpose of Project Half Double is to improve Danish industrial competitiveness by radically increasing the pace and impact of the development and innovation activities carried out within the framework of the projects.

The formal part of Project Half Double was initiated in June 2015. We started out by developing, refining and testing the Half Double methodology on seven pilot projects in the first phase of the project, which will end June 2016.

The current status of responding to the above overall Project Half Double goal for the seven pilot projects can be summarised as follows:

- The Lantmännen Unibake pilot project was able to launch the first stores after 5 months, which is considerably shorter lead time than comparable reference projects, which have had a lead time of 10 months or more. This is in line with the overall goal of Project Half Double of delivering impact faster.

- Four pilot projects have the potential to deliver impact faster, but it is too early to evaluate. Some results might be evaluated in the second half of 2016, while other results take longer to evaluate (Coloplast, Novo Nordisk, GN Audio and VELUX).

- Two pilot projects will probably not be able to deliver impact faster, although it is too early to evaluate them. The evaluation of these pilot projects takes place over a longer period of time as it will take years before many of the key performance indicators associated with them can be evaluated (Grundfos and Siemens Wind Power).

In addition to the current status of delivering impact faster for the seven pilot projects, it is important to highlight that Project Half Double phase 1 has planted many seeds in the pilot organisations concerning project methodology and beyond. The many learning points from each pilot project show that Project Half Double has left its clear footprint in the pilot organisations, and that the Half Double methodology has evolved and developed very much during Project Half Double phase 1.

Downloads

Published

November 13, 2018

Series

Details about this monograph

ISBN-13 (15)

978-87-7507-427-3